The wire is disconnected from the temperature sending unit
(magnetic gauge). A voltmeter connected to the wire reads
0v. What does this indicate?
Answer Posted / nikhil patil
While transmitting the signal the concept of active and
live zero is used.Generally 1V to 5V is standerd signal
range.voltmeter will read 1v when input to the system is
minimum (active zero)and voltmeter will read 0V when wire
is disconnected.Hence troubleshouting becomes easy.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
Draw a great bridge circuit.
What is the diffrence between ff tx and non ff tx
I want to know about DDCMIS in detail ? please explain it. Also give name of reference books in which it is explained in detail in very simple manner.
you must show the examples application and give at least 4 types of transducer/sensors that can minimize the failure during the manufacturing of the resistors.
Definition of reverse and acting controllers:
what is the calibration procedure for transweigh make weigh feeder?
How many interlocks at turbine? Plz explain briefly
WHY THE DEGREE OF VALVE PLUG AND VALVE SEAT IS SLIGTLY DIFFERENT I CONTROL VALVE TRIM DESIGN
Why rdt and thermocouple both give different output .and one things more, how to generate ohm or mili volt plz mail me merajalam143545@yahoo.com
How to Calibrate Flammable gas detector in field
how u calibrate sox nox co2 co in cemps?what is opacity n HPm?tell the standard parameters of cems?
Good evening all I need a small favour regarding reliance paper i wanna probable sample papers(e&i) of reliance. if any of u have any idea about dis then plz mail me back.i belongs to electronics and instrumentation engg.so i need e&i papers. thanking u....
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
Can combine control system for Emergency control system (ESD)and Fire & Gas System ( F & G) is possble to built and offer to client? Can such system is as per Norms in India?
how many types of preheaters are in cement industry & what r they can any body explain?