Answer Posted / archana
basically there r 5 steps of bug life cycle
1.creation:
in this step identification of bug can be done by tester
2.Assinged:
in this step the bug assinged to a developement team.
3.Evaluation:
in this step bug is evaluated which is done by developer.
it means which module or what line of codes are creating
the problem which is identified by developer.
4.Fixing:
in this step bugs r fixed and its makes change in source
repository.
5.verify:
in this step bugs r verified that bugs r fixed or not
which is conducted by testing.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Can any tell me how a clinical data management system is tested? what are the test scenarios? what are the test cases? work flow.
What is Cyclometric testing?
tell me 5 new requirements in ur project? plz urgent
KINDLY FORWARD ME THE INTERVIEW QUESTIONS & ANSWERS FROM REAL TIME POINT OF VIEW FOR 1.5 YEARS EXPERIENCED CANDIDATE. MY EMAIL ID IS sky_bird433@yahoo.com
About Hierarchy level in your company.
Can you please explain about the erp project
What is the most important phase in STLC and Why
Assume a login page, and you have written 10 cases(say for example). How will you justify that these 10 testcase suffient for the login and how do you say this is 100% satisfies the need.
hi this is chik here iam showing my current project ERP and am prepair in hr model please tell me details about it and what all function test in hr model and give me some test caserelated to this module.Please tell me am faceing lots of problem in interview am not able to explain in interview please help me out my id is chiku_69@yahoo.in
What are testing techniques? What is difference between general and specific?
3. In a system designed to work out the tax to be paid: An employee has £4000 of salary tax free. The next £1500 is taxed at 10%. The next £28000 after that is taxed at 22%. Any further amount is taxed at 40%. To the nearest whole pound, which of these groups of numbers fall into three DIFFERENT equivalence classes?
How should validation activities be handled?
In Manual testing how to test proxy servers? can u please explain with example?
1.For a single module how many builds are possible 2.what will be the max or min time to finish up an single module
What’s the difference between verification and validation in testing?