Once the build is given to the tester,what are the test he
is going to conduct list them in chronological
order .....its urgent
Answer Posted / arthieviswa
Mr.Mohan you said that the tester will not involve in
integration testing...
but both white box and black box testing is done in the
integration tsting levels..
so both developer and tester will involve in this testing
level..
we cant surely say that tester is not involved.. it depends
on the project modules.
Sorry if i hurt youwith the answer.
regards
arthieviswa
arthieviswa@yahoo.co.in
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How can we test for drastic (severe) memory leakages?
Hi, Please can one tell me how to test the usability testing, which method has to be used, how to write the report? Thanks Deepa
which test strategy your are fallowing in your company?which documents u r using in software development life cycle?
what is a data guidelines?
What are the phases involved in software testing life cycle?
What is back to back testing?
What is software configuration management?
what is the challenging position faced in the testing not in point of management point of view it must be in the point of while testing the application?
what is date field test case
what are the 3 test tool categories and describe what each can do.
What does entry and exit criteria mean in a project?
Explain the procedure for manual testing.
What are the roles of glass-box and black-box testing tools?
What can you tell about the project if during testing you found 80 bugs in it
What is the difference between load testing and performace testing?