11kv/0.433kv, 2 mva , transformer , for protection and
metering how many CT/PT are required?
Answer Posted / manjunath kunigal
one set of tertiary winding CT/PT is sufficient for both
metering and protection.
| Is This Answer Correct ? | 11 Yes | 9 No |
Post New Answer View All Answers
How to measure the earth resistance value in a concrete pavement(flood light area)?
What happen when change order of CT in GIS feeder?
What is the actual calculation for transformer short circuit test?.
How to decide CT & PT ratings for a given transmission line carrying some rated voltage?
how invertor convert the dc into ac give brif detail
What are the commonly used schemes for the bus zone protection?
How to dimensioning SDCCH, LAPD and CS7 signaling on GSM?
What is the selection process of breakers. Can any one please give a formulation on same?
how we explain parallel paths armature winding?
explain remenance . differentiate high remenance type ct & low remenance type ct
What current flows in the transformer primary when its secondary is open?
The power supplied to a 33microF capacitor from a 120V, 60Hz source will be
what are the preventive maintanance actions taken for air circuit breaker? please answer me
During underground cabling in landscape area what did we cover the cable with to prevent the electric shock & protect the cable?
how much value of resistance should connect to 15 kw, 6 pole 3 phase slip ring induction motor having RV-240, RA-42.