Once the build is given to the tester,what are the test he
is going to conduct list them in chronological
order .....its urgent
Answer Posted / kannadiga
Once build is given to tester
1. Smoke testing
2. Ad hoc testing
3. Integration testing
4. System testing
5. Performance testing
6. Acceptance testing
Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
What is the difference between code walkthrough and code review? What is the difference between walkthrough and inspection?
Tell some examples of bug severity and bug priority?
what is the difference between test case and result matrix
What are the tasks of test closure activities in software testing?
what types of bugs will we find out in banking projects
What is the procedure of manual testing?
What is PBX Testing & What is Test coverage?
what are the risks and contingencies u had in ur project?
Tell me example for Risk,Mitigation,Assumption?
write test condition for testing SMS service of a mobile phone maximun length is 100 character while sending and 80 character for receiving write test scenarios do not write test cases
What is the difference between load testing and performace testing?
What is test closure?
What is a test server?
What are the various techniques in black box testing?
What is a defect?