Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

PLZ. PLZ. PLZ. Pay attention can i have details regarding
QMS/SPC/MSA/TS16949 ?????

Answer Posted / rajkumar

SL.NO TS 16949 : 2002
01 TS (Technical Standard) is a Specific Standard
applicable for automotive industry.
02 Developed by IATF (International Automotive Task
Force), JAMA (Japan Automobile Manufacturers Association),
& T.C - 176
03 Include Documents requirements of ISO 9001
requirement + Customer Specific requirement defined by each
Customer.
04 Goals are continual improvement defect prevention,
reduction in variation & wastages in supply chain & avoid
multiple certifications.
05 It has restricted for 8 Clause which are includes
all process Standardization
Clause 4: Quality Management System (QMS),
Clause 5: Management Responsibility.
Clause 6: Resource Management
Clause 7: Product realization
Clause 8: Measurement, Analysis & Improvement.
06 Exclusion are restricted to Clause 7.3
07 Responsibility clearly addressed for complying
customer requirements even when outsourced.
08 Control for timely review distribution
implementation of Engineering specification or
modifications to be addressed.
09 Retention period to conform to regulatory &
Customer requirements.
10 Top Management to review the efficiency &
effectiveness of Product Realization process.
11 Top Management to define quality objectives &
Measurements that are included in business plan & used to
deploy quality policy.
12 Specific Responsibility of Quality added.
13 Customer Representative also needs to be designated.
14 Additionally Management Review to focus on QMS
performance, actual & potential field failures ect.
15 Additionally Training, On Training, Employee
motivation & empowerment emphasized.
16 Additionally Plant, Facility, Equipment &
Contingency planning emphasized.
17 Additionally Product Safety, Personnel Safety,
Cleanliness of premises emphasized. (6S)
18 APQP (Advance Product Quality Procedure) Process or
Process recommended by customer to be followed.
19 APQP, PPAP (Parts Process Approval Procedure), FMEA
(Failure Mode Effective Analyses), MSA (Measurement System
Analyses), SPC (Statistic Process Control), Systematic
Problem Solving process etc needs to be followed &
demonstrated.
20 Additionally Collecting Customer Specific
requirements w.r.t. QMS is very critical to meet customer
requirement.
21 Additionally MDT/CFT approach, Product &
Manufacturing Design input, output, monitoring prototype
program & PPAP process are emphasized.
22 Additionally requirements related to Compliance to
regulatory requirement, Supplier QMS development,
purchasing from Customer approved sources, Supplier
performance monitoring are addressed.
23 Additionally Control Plan, Work Instruction Tooling
Management, Preventive & Predictive maintenance, Production
Scheduling etc. needs to be demonstrated.
24 All the Production processes need to be validated.

25 Identification & Traceability is mandatory.
25 Customer owned tooling requirements addressed.
27 Additionally FIFO (First in First Out), Inventory
Management Systems needs to be addressed.
28 Additionally MSA, Calibration or verification
records, internal & external laboratory requirements added.
29 Basic knowledge on statistical concepts to be
demonstrated.
30 Additionally Customer satisfaction to be measured
using internal performance data. (Internal & External PPM)
31 Additionally Internal Audit to include QMS audit,
Manufacturing Process Audit, & Product Audit.
32 Additionally Manufacturing Process monitoring
requirements addressed.
33 Additionally layout inspection, functional testing
requirements, Control on appearance items emphasized.
34 Additionally Control on reworked product, Customer
waiver etc. are addressed.
35 Additionally analysis of Quality & operational
performance emphasized.

36 Continual improvement should be process driven with
special emphasize on manufacturing process
37 Additionally Systematic problem solving approach,
mistake proofing & Return Product analysis, addressed.

Is This Answer Correct ?    5 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Fabrication Defects

2459


if any one attended caterpillar placement pls send the model questions and the question pattern.....

2670


material grade c 45

1525


In some engines glycerine is used in place of water for cooling of engine. Why ?

1356


When repacking a valve the rings of packing should be oriented so that the packing ends are installed ____________.

2256


Who built the trans alaska pipelene?

1067


written test: 1) periodical and monthly maintenance are called preventive or panned maintenance. 2) Mechanical seal parts and their material. 3)Urea plant main parts and their construction material details.4)Name diagram of the given turbine5) Turbine nomenclature like API name.6)All types of corrosion like Galvanic and oxide with example.7)Parts of gate valve and its usage. diaphragm gate valve usage. etc.....

2280


What are you going to inspect or check when you open the crankcase?

2106


Tell me on steel

1571


what do you mean by resistivity survey of tubewell

2294


what is cathodic protection? where it is used and when? and why?

2006


wt is dynamic coupling????

1956


Name Of Parts And Each Purpose

1988


Is IS 2062 different from ASTM A 36 or both are almost same

19774


The amount of radiation emitted per scm per sec is called …. ?

1064