What is C.T, why it is used and what care should be taken
for that while connecting?
Answer Posted / bo
Care must be taken when selecting the Class of CT's. They have to be ordered specifically for their intended purpose. Metering CT's are highly accurate, but will saturate at network fault currents and cause maloperation if inadvertently used for protection.
CT secondary wiring must always have 1 ground connection, this is to prevent a dangerous voltage build up due to capacitive coupling from the Primary voltage which could be thousands of volts. (Ground connection is not required on LV installations below aprox 500V).
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is acsr cable and where we use it?
Explain the construction of the conservator, operation and purpose, and draw the diagram of the conservator.
Why synchronous motor is used in power factor improvement,dc series in lift
Benifits of 3ph 4 wire metering over 3ph 3 wire
why in the three pin plug all 3 pins are cutted ?
what kind of technical test that i need to learn because i have an interview tomorrow.. please someone help me..
what will happen if there is a voltage leakage or current leakage in an electrical train
in our all power plant have connected in grid and grid voltage and plant voltage is same, but as per as electrical concept the power will transmit from high potential to low potential but here altough same,then how power transmit from power plant to grid.
Why squirrel cage motor can only use with low starting loads ?
what is the minimum recommended leakage current of an earthed cable connected to the body or skid of an alternator
can any one tell in easy method for circulating current ??
Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
why we get 2 differnet values for power factor in 2 watt meter method in 3 phase
Whether amorphous core transformer is available in India?.If available then up to what rating of voltage and KVA?.
at which voltage level arcing ground is occurs ??????????