What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / kirishnasekar m
all sides - next day itself (24 hours)
slab < 4.5 m-7 days
slab > 4.5 m-14 days
beam & arches < 6.0 m-14 days
beam & arches > 6.0 m-21 days
staircase waist-7days, after removal of shutter, props to be fixed for 3 days
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to do bbs in excel format
how many minimum admixtures are used in water froofing structures
in one SQM plaster how much Cement and sand consumed in ratio 1:4
What are the composition of a landfill?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
what is kribs is supporting?
Define What are the reasons for geotechnical site investigations in Uganda?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
What is absolute pressure? How absolute pressure is calculated?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
What is the Roll of Water Bonding under VDF road?
what is the clear cover for shearwall?
to draw bm diagrams for portal frames under different loadings//
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor