how much cement,sand,aggregate will use for 1 cum in ratio of
1:2:4.
Answer Posted / karim
Quantity: 1cum
Proportion: 1:2:4[M15]
Add 54% extra
[54/100×1]+1=1.54cum
Cement required =1.54/7=0.22cum
We know: 1bag cement=0.0347cum
So, No of bags of cement =0.22/0.0347=6.34bags
Sand required: [1.54/7]×2=0.44cum
1cum=35.347cft
So 0.44cum=15.55cft
Aggregate required =[1.54/7]×4=0.88cum
So,0.88cum=31.18cft
Finally,
[Cement required =6.34bags
Sand=15.55cft
Aggregate =31.18cft]
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Define What is Civil Engineering?
what is E
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
will fix foundation bolts at site with out template is there any procedure?
material used for mendrel use to bend epoxy coated rebar
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
Define relative co-ordinates?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
How can i display 5 asterisk and another 5 asterisk )?
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
quantity of material needed for rubble stone masonry for 1:4 and 1:6
Time required for curing of wall tiles before fixing
What you understand by building codes?
What is pre-stressed concrete?
Which type of plywood & sizes using in construction projects ?