Answer Posted / keshava c
But eff.0.85 how to take o. 85 efficiency
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
why we setting 95 deg and 105 deg in wti and oti of distibution transformer ? give the reson for that ?
Why we use circular(Stepped) cross section in transformer core?
Please clarify 1. Icw: rated short circuit working withstand capacity 2. Icu: Rated ultimate breaking capacity 3. Ics: Rated service short circut withstand capacity 4. other specification of ACB
i karmveer bharti persuing b.tech . plz send me syllabus and name of reference books. for preparation of section eng.
Differnce between negative Pahse SequenceFunction and unbalance Function?
1.Can we use 6.6/11KV 300sq mm xlpe 3core cable for LT use (415 Volt). 2. If we use it for LT then what is the current rating
Is the installation of the filter cloths necessary before spreading the gravels at the transformer yards?
if 6 earth pit value is 1.5 ohm then what should be the number of earth pit to make the value .8 ohm
What is meant by time harmonics and space harmonics?
There are Two questions about Steam Turbine Generator... What is HRSG bypass of LP, HP used for in power generation? In particualar, in the event that fault of HP bypass, there would be STG TRIP in operation but none on the LP bypass fault...what's the reason ?
lorteny method
If the feeder rating is 7.5 kw or 10 HP star-delta feeder, MCCB is taken as 63 a, contactors-32 a, how much will be the OLR rating or which range OLR should be considered when we concern about type-2 coordination?
Which Class insulation is prefered for the sandwich Busducts ? Why?
What is the accepted limit to increase the choosen transformer capacity over the load and why ?
I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE