Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate the quantaty of steel in footing please show
me detail procedure with the help of drawing

Answer Posted / mutual basha baig

Qty of steel(in kgs) =no.of bars×length of bar × unit wt of bar ×simillar objects.

@unit wt of bar =diameter of bar/162.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me

1920


In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?

1020


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

3418


door and window wood work calculations and different methods

2081


what are the duties of Site Engineer in work site?

1586


what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..

2455


How to plan a project

2235


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2226


What are some structures that may be subjected to fatigue?

1076


Aptitude, reasoning, quants, verbal and technical question

1501


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2051


cause of cylinder test failure

3246


Define absolute co-ordinates?

1226


Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?

2114


how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?

2542