how to caculate cutting lenght in bar bending schedule for
180 degree bend
Answer Posted / amol pawar
For 135 180 and 90 degree bend hook length is 12D ,9D, 8D
Where D is diameter of bar
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is an ice dam sock?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
What are your future hopes for this job?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
what is the difference between natural draught cooling tower and induced draught cooling tower
Does VDF add strength to the flooring apart from preventing water ingress?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
how pumping of concrete effects the quantity of material used in it?
what discoveries did you have in relation to your course?
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
how to estimate material requirement for an area of house in square feet?
How can I make justification between using concrete grade c35 compare c37?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..