1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / shubham agrawal
Brick=500
Sand=.274cum
Cement=1.3bag or 66 kg
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to convert cement, sand aggregate quantity from M3 to kg with full description?
specifications of fe500 steel
give me the rate analysis for Bituminous Macadam and SDBC
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
What is the difference between absorption & adsorption and sorption?
In earth work 1300 cum soil how to calculate how many liters require in water
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
Give me an example of a time when something you tried to accomplish and failed.
What is the meaning of a blue land surveyors flag?
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
Why should you show Client/Engineer activities clearly on the project plan?
What are some structures that may be subjected to fatigue?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com