for construction of 1 cum of brickwork what is requirement of cement, sand and bricks
Answer Posted / ravi
bricks 500
volume of mortar =0.2035 m3
dry volume of mortar =1.33*.2035=.306 m3
cement =.306*1/7=.0403 m3
sand=.306*6/7=.362 m3
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
what is kribs is supporting?
What is an ice dam sock?
What is the compressive strength of fly ash bricks?
How many axes do cartesian coordinate system has?
Trapezoidal section footing calculation of Volume & its Area
what are the Task work of different labour.?
Explain what is the difference between built area and super built up area?
What is the use of offset command?
In Rcc ratio calculation I wanted to know quantity of Steel also.
How many % we consider for lap for reinforcement for estimates
How is make concrete cube?
how to prepare site mix design
Which tests are performed on soil to decide the type of foundation to be provided.
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?