Answer Posted / satish tiwari
Lab testing in different and particle size and job mix according and moisture
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
rimmer in pile foundation
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
How to calculate the force on a column of three story building. What should be the base concrete height?.
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
What is type failure of road surface? how to repair the failure of road surface?
how to calculate steel for slab or footings?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
what is moment-curvature relationship in semi rigid connections??
What is passive earth pressure ?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is pile and deam foundation
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is an ortho mode?