How will be the Ticket process flow happens in a Production
support project
Answer Posted / sudhir m dandinavar
Every query which are generated from the ticket are consider as request and based on the priority from the client we resolve the issue.
Priorities can be classified as high medium and low and based on the priority we have the resolve or close the ticket with the specified period of time.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the difference between make-to-order production with and without assembly processing?
What are the challenging issues you have faced in implementation project/Maintenance project in SD Functionality? How you have overcome that issue???
What are the different types of partial agreements available in sap sd ?
How to assign division to sales organization?
How we improve our pricing procedure?
In a material master what is the base unit?
what is difference between individual and collective requirement
What is cumulative condition record?
Are there any user exits or any other way to include new fields in the sales order va01?
What are the three approval steps you need to follow as a part of approval procedure in qas? : transportation management
We can define our own exchange rate types and use them instead of the defaulted types, ‘m’, ‘b’ and ‘g’. How can we overwrite default types in sd?
How would you configure ‘partner determination procedure’? Explain
Once the system determined the item level schedule line category automatically in the sales order, can you still change it manually?
Difference between business sale cycle nd customer sale cycles?
What are the effects of posting goods issue? Explain.