Brick size 230X115X150mm, how many bricks, quantity of sand,
cement required to construct 10 sq mtrs of 115mm thick brick
wall.
Answer Posted / nirmala
earthwork excavation by manual means for foundation of buildings,culverts,water supply and sanitary lines and electrical conduits etc.either in pits or in trenches, in ordinary soil including dressing the bottom and sides of pits and trenches,stacking the excavated soil clear from edges of excavation with lead up to 50m,including breaking of clods complete as per specification ,including pumping of water,including cost of all labour,material,transport,hom of machineries,all lifts,loding and unloding .specification no KBS 2.1(a)/2.3.5.work to be completed as per the directions of the engineer in charge.
UNIT QUANTITY RATE(IN RS) AMOUNT(IN RS)
Cum 230 204 46920
please tell me the how its came quantity
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how many litres of enamel paint required for 5000 sft of site??
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
five benefits of using standard terminology in the measurement process
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
What is meant by scaffolding coefficient?
what is labour consume factor in residential projects
What is demising walls?
how many time use of plywood shuttering and IS code
how water proof chemicals act in concrete to avoid leek?
where i can get material costs on weekly basis
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
Explain what is Critical Path Method (C.P.M)?
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used