Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why did you choose to be an civil engineering

Answer Posted / swamy naidu

Civil engineering is the best,because we are creaters of the world. Is there any person in the world to create something new is only possible by a civil engineering and it is very interested and excited.....and we are developing the nation also....

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What does a construction cost covers and what does not?

1256


how to clculate the %of concrete strenght achive after curing?load

2482


how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar

2419


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

2245


What are the reasons for geotechnical site investigations in uganda?

1202


What is the cemnent ratio

2327


which has high compressive strength between hollow block and brick masonry?

2425


CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL

2226


what is idealized curve for concrere and steel

2396


how i get all type of short type question answer about civil engg

1762


During reclamation how can the occurrence of mud waves can be rectified?

1351


What is the minimum size of the particles of silt soil?

1432


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2173


What is passive earth pressure ?

1250


what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE

4158