what is water cement ratio m10,m15,m20,m25,m30,m35m ,m40
Answer Posted / ravi
M20= 0.55
M25=0.50
M30=0.45
M40=0.40
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What things architect have to take care of before starting any project?
what is anchorage length,lap length and (dont remember the last one)
What is c.g.i sheet which used for roof??
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
What is the difference between Hinged and pinned in Column ends
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
What is made from large rocks, which protects the base of cliffs?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
what is idealized curve for concrere and steel
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
what are the Task work of different labour.?