1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / remesh babu pillai .k .p
Bricks .540nos
Sand.10 cft
cement .1.5bags
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
What is construction mitigation management?
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
What is bmc stands for in bmc software?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
Calculation of Pier Cap with tapper area?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
Which ratio use for cement selery???
How much of the strength of concrete comes from post- production curing?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Formula of area of crane hook
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
How much quantity of rod binding work by a rod binder per day