Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How can calculate ups battery back up time?

Answer Posted / basanta das

Ups Standard Bacup Time = (Battery Volt X Each Battery Ah X No. Of Batteries) / load in VA
For example: Volt 12 x AH 26 x Total batteries 16 = 4992
Now divide the above with required load (1 KVA) =1000VA
So result is 4992/1000 = 4.992 hours
Means your UPS will run for 4.992 hours in standard calculation method, but in actual there will be a UPS energy waste or dissipation, let your UPS efficiency is 80% then you will get actual time
4.992 x 0.80 = 3.9936 hours i.e approx. 4 hours of backup time for 1KVA load if you have 12volt, 26AH battery of 16 nos.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hello friend i wish to study a course related to the electrical construction, controlling and monitoring , which course i want to study? pls give me the name of institute?

1802


Explain thin film resistors and wire-wound resistors

1030


how to identify the cable quality and what is flame proof cable

2113


please give me solution to rectify the emi(electromagnetic interference)

1920


If mutual flux is 1.2wb & power factor is 0.8 lag , then what is the Useful flux of a transformer?

4491


HOW TO REDUCE POWER PLANT AUXILIARY POWER CONSUMPTION?

3419


What is the formulae of Megger value for a A.C.Motor

2901


HOW TO DESIGN THE body EARTH cable(Copper Conductor) size for 60KVA UPS?

2001


What is super thermal power plant? and how it will differ from normal thermal power plant

2288


what happens if earth of 33kv cable is not connected to earthing pits? please send this query's answer to ngrm.sudha249@gmail.com

2041


why electronic instruments is more favorable than electrical?

1980


why we use 630mm single core cable for transformer secondary side and why two neutral cable

1845


we have require a Motor (1500kW, 6.6kV, 50Hz) which shall operate at 1500rpm during 30min and after it shall run on 500rpm during 15min. The same cycle shall be repetitive during the whole working days. Which method is best and economic to achieve such type of task. VFD, VVFD, Pole changing motor etc.

1922


what is earthing transformer? draw the winding dia.of earthing transformer.

1731


what is the meaning of osr in transformer.

2151