How to calcualte the total number of cells required for
particular UPS of some X KVA with 3 and 5 hours back-up?
Answer Posted / maksoodazhar@gmail.com
24v×100ah= 2400 watt hr
Backup time = 2400/total load
= 2400watthr/1kva
= 2400/1000×.8
= 2400 watthr/800 watt
= 3 hr
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Why PS class CT is always preferred for Differential protection?
Explain about c.t?
WHY EARTHING NOT NEEDED IN BATTERY IN SUBSTATION
what is the purpose of shading ring or shading coil in electrical equipments.
is there any chart showing the suitable cable size according to AMP and length ? for three phase motors
Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.
how many synchronous motor are there in any power plant
dc supply given to dc generator winding.how is possible? my knowledge is saying the winding will burn. please reply.
How can we calculate strength of copper hich is supplying electric power to heater and in it hold the heater also and what r all types of forces which is acting on it...
how 650 volts creates? where is use?
If we need4× 50mm sq cable but it's not available so we can pull 4×25mm sq 2cables
How we calculat the NGR of 3phase Generator, Our generation voltage 11KV
in a silicon diode we can measure .7v in a voltmeter.but why we can't use this voltage for using?
Hello sir, pls send me hpcl technical test papers .i am. Appearing for the exam.
We need to current density & short circuit calculation at 65kA for aluminium & copper busbar.