How to calcualte the total number of cells required for
particular UPS of some X KVA with 3 and 5 hours back-up?
Answer Posted / maksoodazhar@gmail.com
24v×100ah= 2400 watt hr
Backup time = 2400/total load
= 2400watthr/1kva
= 2400/1000×.8
= 2400 watthr/800 watt
= 3 hr
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Why the frequency of ac in india is 50 hz but in some other countries it is 60 hz.
can anyone provide me a amf panel control wiring using ec-2 relay?
What is difference between safe PLC and normal PLC
I have iti elec, 1st aid, and 5 yrs experience in 7.5 mw power plant. Am i eligeble for 11kv license in telangana state..when, how to apply for that.?
how we decide scurt (disc) of insulator with respect to kv rating
In what cases (circumstances)we should apply P controller, PD controller, PI controller & PID controller ?
how give earthing conection to household equipment?
what material is used in capaciter
What is different between Difnit time and instatous over current relay
Is there any Institution for giving M-tech in Electrical engineering for those who r in service? Give the details please.
How to calculate pitch, gauge of winding wire, and No. of turns for 30HP, 3 phase, 4 poles 50Hz, 380V induction motors
What is the rate of WCT on the Electrical Contracts comprising of DG Sets and Civil Works in Delhi ?
When we use 3 terminal resistor?
hai friends i have BSNL JTO exam on next month so if any body have model question paper or give preparation tips to my mail id kumar4486@yahoo.co.in this will helpfull for my future .plz & thank u by kumar
what is meant by directional earth fault and non directional earth fault? describe both.