1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / umesh sharma
Answer/ Umesh Sharma
Dry material required for 1 cum. of brick masonary =0.30 cum.
Nos'. of brick required for 1 cum. of work = 500 Bricks
Cement required for 1 cum. of brick = 1/7x0.30x28.8 = 1.23 bags.
Sand required for 1 cum. of brick = 6/7x0.03 = 0.257 cum. ( 9.08 cft.)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is Short bored pile foundation.
1m square 20mm plastering how much of water need curing work
Which is stronger solid steel rod or hollow steel pipe?
Are you ready to relocate with your immediate family to United States as a new employee?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
What is the cost difference between site mix and ready mix concrete per cubic meter
please send me bhel questions on rupesh.017@rediffmail.com
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
what is E
What Reinforcements Are Used In The Process Of Prestressing?
Define What is the distance between railway tracks?
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?