Whats meant by trivector meter where it is connected at the
substation?
Answer Posted / surajit mishra
This refers to Mr Jaimin Modi's question about Import and Export. Suppose you are operating an industry, and you have also installed a Generator. So, you are a consumer importing energy from the grid and you are also a producer and can export energy. The Trivector meter designed for 4-quadrant operation can record energy imported by you from the grid and also energy exported to the grid. The billing is done substracting one from the other value.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the difference between vector scale and vector diagram?
Why delta star trformers are used for lighting loads?
What type of a DC motor would you use for a lift?
why ten delta testing is carried out on power transformer
how to generator maintenance (A Check, B check,Etc)
How much current will a 5 HP delta connected motor at no load will take?Is tat need a starter
Q: How to calculate Transformer losses , tell us by Formula.
How can we increase the capacity of Energy.?
What are the applications of the electric motors?
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
what is the need of starter in tube light and what type of starter is used in that?
What are the types of the glands and difference between single and double compression type of cable Glands.
An 8 pole, 50 Hz, 3-phase IM is loaded to a poing where pull out torque will occur. The rotor resistance per phase is 0.3 ohm and motor stalls at 650 rpm. The slip when motor stalls is A 1 B 0 C 13.33% D 10.33%
i want to learn control schedule for 11kv panel? can any one send the detailed control schedule?
why T/F winding temp measurement cts are odd secondary current ie,109A/1.2A/1.4A?