"Why you consider yourself suitable for the post"
Answer Posted / sandeep
I can give my 100% to any work you will offer to me which makes me to be right fit for this job.
| Is This Answer Correct ? | 8 Yes | 3 No |
Post New Answer View All Answers
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
how to caluclate sienerge qty in construction in ap
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
What is the difference between Grade I, II and III of GSB?
plz.show development and anchorage length in simple diagram.
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
How you can use different dimension tools in cad? What are the different dimensions available?
How much quantity water should be placed in one cubic meter area?
Why should appointment store person for project ? what is the benefits for company ?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
how much quantity of cement,sand and water required for 1 sq feet flooring work .
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum