I am good with people and handle the problem which are faced in the team word. I have my communication skills to understand the other person and use and exercise my talent to improvement in the company and increase the growth of the company . I am also a good listener , confidential personality and trustworthy personality that is required for that position.

Is This Answer Correct ?    17 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

4468


writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order

1496


Which tests are performed on soil to decide the type of foundation to be provided.

1644


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

1673


what is right & short method of measurement of slab&beam

1647






what is the basic difference between Coloumn & Shear Wall

1692


What is missing report and how to prepare

1027


what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain

1323


How will you Engage Labours on Site?

1416


a butt weld is specified by

2593


What is the difference between tor steel and tmt steel?

660


what is detail procedure of eccentric footing? plz. give solved exmple?

1838


The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.

2312


What is horizon or horizontal mining?

644


Curing time for 1)R.C.C slab 2)B.W 3)Plastering