IF we have 500kva transformer 11.0/0.415V, 50Hz. How to
calculate the current on HT & LT side, how can we consider
for its breaker (HT & LT both)? You are requested to solve
the question herewith.
Answer Posted / a.i.a
As, usually the ultimate load current for any distribution system take 20% spare loads for future , so full load current shall be multiplied by 0.2 more (i.e 1.2) to calculated MCCB rating.
hope you got the correct answer.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
During Testing of Maintenance Free Earthing, How deep should be the Spikes of Earth Test Meter should be inserted in the soil(one spike is 15 Meter & Other spike is 30 Mtrs away from the Main Earth Electrode. Because, recently, we observed that when spike is inserted 3-4 Inch in the earth- results are better, If spike is inserted 1 feet deep than results are increasing.
What are different types of control systems?
how does grading rings & spacers in transmission line works? Working Principle?
I need bhel previous year quetion papers for electrical engineering department.I searched but i could not find out
For electrical designers what are the standard should know? i want learn about this standards. how to get information/reference. anybody help in this regards please.
what is the need to express current and voltage in rms value? rms value is also called as effective value,what is effective value?
What is the function of NER and NET?
circuit diagram of trip circuit supervision relay
Determine a suitable number of slors and conductors per slot for the starter 1 winding of a 3 phase, 3300 V. SO Hz 300 rpm alternator. The diameter is 2.3 m
What is the difference between in Fourier series and Fourier Transform. and please tell me the difference between both of them and the why we use them in communication system?
How many size of cable required for a 300m long and 30kw inductive lode
what is the difference between switchgear and circuit breakers and is there any difference between outdoor and indoor switchgear and circuit breakers , and how would you differentiate between switch yard and substation and grid station . thanks
How many wall/floor flange will i use in bus duct system if we have in our design a 35th floor building.
what is the maximim current drawn by 1 phase and three phase welding machine
if we give 60 hz single phase supply to the transformer used in europe , than what will happen