Method of findingthe dry ingredient quantity of 1 m3
concrete.
Answer Posted / tarique08
suppose, concrete mix ratio = 1:1.5:3
then, sum = 1 1.5 3 = 5.5
as we know,dry material required for 1 cum. of concrete =
1.54 cum.
then we can find -:
(1) cement = 1*1.54/5.5 = .28 cum. or .28cum.* 28.8= 8.06
bags.
(2) sand = 1.5* 1.54/5.5 = .42 cum.
or .42cum.* 35.3 = 14.83 cubic feet.
(3) coarse aggregate = 3* 1.54/5.5 = .84 cum.
or .84 cum.* 35.3 = 29.65 cubic feet.
so, dry ingredient quantity required for 1 m3 of concrete-:
cement = 8.06 bags.
sand = 14.83 cft.
coarse aggregate = 29.65 cft.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
Does brick grows bigger every year?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
What is the biggest dam in america?
How to find out slope footing concrete
how pumping of concrete effects the quantity of material used in it?
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
Why does the pressure increase under soil?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
What is rate of concrete surface rendering work per sqm