Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Thirty men take 20 days to complete a job working 9 hours a
day. How many hour a day should 40 men work to complete the job?

(a) 8 hrs
(b) 7 1/2 hrs
(c) 7 hrs
(d) 9 hrs

Answer Posted / yashwanth krishna

If the question is "how many hours should 40 men work to complete the same work done by 30 men working 9 hrs a day for 20 days?" then my answer would be,
if 30 men can finish a PIECE OF WORK in 20days then
1man's work will be 1/30for 20days and 1/30*20=1/600 is one man's 1 day work
then 40 men's 1 day's work is 40/600
and 40 men can do the work in 600/40 days=15days(working 9 hours a day)
which is 135hours(15*9)
if the work is to be completed in 20 days then 40 men should work 6.75hrs a day(135/20)

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

10 : 4 seconds :: ? : 6 minutes

1335


three students appear in a test but no one write there name on answer sheet .and they submitted their sheet to teacher . when teacher distributed their answer sheet . what is probability that no one get their own answer sheet.

1118


2 persons start from a pt. and go in opposite directions. After going 3 km they turn left and walk 4 km . how far r they now?

1911


a man covered 28 steps in 30 seconds but he decided to move fast and covered 34 steps in 18 seconds. how many steps are there on the escalator when stationary.

1238


mention your extra-curricular interest. Which do you actively pursue? how do you see these developing in the future?

3349


In how many rows will 200 Miranda bottles be placed, if 200 Miranda bottles are stacked in such a way that there are 20 bottles in the bottom, 19 in the next row, 18 in the row next and so on?

1186


In the given quadratic equation, mx2+nx+o=0 .If the ratio of the sum of the roots and the product of roots is 2:7, what can be possible values of b and c?

1222


A fuel dealer mixes two brands of fuel which cost in the ratio 2:3 A solution of 30% Brand A with Brand B yields profit of 10% when sold at RS 297. What is cost of brand B?

1922


Two trains at speed 60 km/hr come in the opposite direction. At a particular time the distance between the two trains is 18km. A shuttle flies between the trains at the speed of 80 km/hr. At the time the two trains crashes what is the distance traveled by shuttle?

1216


In a typical motor cycle rally, every motor cycle has to reach a speed of 20 m/min within a minute and it increase its speed by 20 m/min and the sum was 1600 m/min. Four minutes later, a new motor cyclist started running in the race. After another two minutes, the motor cyclist with the speed of 400 m/min stopped due to injuries and again two new motor cyclist started running in the race. What is the current average speed?

1093


There is a certain four digit number whose fourth digit is twise the first digit. Third digit is three more than second digit. Sum of the first and fourth digits twise the third number. What was that number ?

2554


if out of x bulbs y bulbs are broken;the % of non broken bulbs

1228


Find perimeter of a trapezium with 3 sides given and distance between parallel sides given.

1620


In an exam, a girl scores 85% in one subject and 88 % in another subject. What percentage does she score in the third subject to get an average of 88% marks?

1069


There is a work which can be completed by A with 12 days and B by 18 days. A and B works together for 3 days and B left. After that how many days for A to complete the work?

1103