Answer Posted / naushad siddique
ITP stand for Inspection of Test Plan
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
types of piles detail,
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
150mm bricks size how many use 4.14 m3
what is anchorage length,lap length and (dont remember the last one)
For a washout valve why are two gate valves required in normal practice?
how to design and calculate materail quantity for concrete speedbreaker ?
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
what is work of planning deptt. in any construction compny (in road project)
how to caliculate required amount of cement and sand required for 1cu.m.
How do you determine specific gravity of cement?
Explain the various stages of the project planning process in construction?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
If specific gravity of cement is less than 3.15 what is the cause?
What is meaning of FREE STANDING STAIRCASE ?
What are the phases inspections are done by local authority while construction?