Answer Posted / naushad siddique
ITP stand for Inspection of Test Plan
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
What is thumb rule for deep trench excavation
What are the uses of alloys in daily life and how are alloys made?
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
What are the advantages of cad software’s?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
What is the diff between cad & cadd?
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
how to calculate number of bitumen for road asphalt