What is the correct position of lapping splice of reinforcement steel bars in a beam at top & bottom of the beam?? what is the reason for this location?..what are the factors affecting lapping location in beam?

Answer Posted / jagga

The location of splice should be 30-50 cm above the floor level

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is chemical composion test

1506


density of crush sand & crush stone or grit powder

6301


What is type failure of road surface? how to repair the failure of road surface?

1978


What in bending moment, if a moment is free end of cantilever beam?

712


Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day

1583






What is the cemnent ratio

1821


what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

1957


what are the proper pipes for salt water line

1857


how to estimate material requirement for an area of house in square feet?

1736


how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?

1573


What is the strength of 1:6:12 mix?

2595


what is total volume of ingredients used in concrete accordingly

1805


what is the maximum number of course that can be laid according to IS code and the max height.

1486


why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?

2585


within an emergency scenario what are the safe systems of work a coss can setup as part of is duties

1577