What is the correct position of lapping splice of reinforcement steel bars in a beam at top & bottom of the beam?? what is the reason for this location?..what are the factors affecting lapping location in beam?
Answer Posted / jagga
The location of splice should be 30-50 cm above the floor level
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How many types of slabs are there & how to design it?
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
Forces in a Shear Wall are in plane or out of plane ?
In block work seawalls what is the purpose of slip joints?
how much cement and sand required for 100sqm of wall plastering in different proportions
how to prepare site mix design
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
what is the use of water bar in water tank and is this an extra item in estimate?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
How to calculate the load of partion in flat slab if we use brick?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
What are the advantages and disadvantages of lead products in construction?