how can we calculate cutting length of a column ring
(300 x 600)
Answer Posted / mukesh
column cover=40mm
L=600-40-40=520mm
B=300-40-40=220mm
length of master ring=520+520+220+220+2×10d-5×2d
(assume dia of ring =8mm)
1560 Ans
| Is This Answer Correct ? | 26 Yes | 2 No |
Post New Answer View All Answers
What is meant by Crystal Concrete?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
What is the primary difference between adsorption and absorption?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
how to calculate steel for slab or footings?
How long does it take concrete to harden?
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
how do you stabilize a waterlogged area in road construction
What is meaning of FREE STANDING STAIRCASE ?
What is the worlds largest concrete dam?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?