Answer Posted / sarath naryan nair
For slabs = 1.0 % of concrete volume.
For Beam = 2 % concrete volume.
For column = 2.5 % of concrete volume.
Is This Answer Correct ? | 34 Yes | 2 No |
Post New Answer View All Answers
How to calculate laplength for 3 floors
how much area can be platered by a mason for exterior
what is the formula to find the diagonal shape stirrups?
i need gate exam civil engineering question papers with answers
what are the changes in concrete pour height as per IS 456, 2009?
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
What are the materials used in building a gravity dam?
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
what is Bearing Capacity,How to determine it?
what do you know that m20,m25
What do you understand by “preset” during the installation process of bridge bearings?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
satart to end steps by step process of building construction...? i want to planning theme accuretly