Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate the loads on slab? what are the steps?

Answer Posted / abdul tawaf khan

1) Dead load of slab = 1 * 1 * 25 * D
2) Live load of slab = 1 * 1 * Live load intensity as per IS specifaction
3) Finishing load = 1 * 1 * 24 * t
Where , D = overall depth of slab
t = thickness of floor finish
Also condier Wind load, if any case.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??

3304


what is the water-cement ratio of mix design while 30mpa in 7 days?

3068


why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure

1635


sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience

2491


How to identify the vitrified tile and ceramic tile by observation only after executing the job.

997


significance of specific surface area of particles?

2270


how to calculate the scour depth

2952


for pretensioning which will yield first and same for post tensioning?

2270


What is the maximum strength of cub compress strength in one cub testing

1882


What are the applications of the modulus of elasticity?

1114


What is aggregate?

1137


Where is the worlds longest elevator and how long is it?

1163


Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.

2550


50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?

1966


Critical Path Method is...

2119