Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate the loads on slab? what are the steps?

Answer Posted / abdul tawaf khan

1) Dead load of slab = 1 * 1 * 25 * D
2) Live load of slab = 1 * 1 * Live load intensity as per IS specifaction
3) Finishing load = 1 * 1 * 24 * t
Where , D = overall depth of slab
t = thickness of floor finish
Also condier Wind load, if any case.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is missing report and how to prepare

1569


dialation means

2441


What is the Unit weight of coarse sand (F.M- 2.20) ?????

1969


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1882


What are the ingredients of pre-stressed concrete?

1225


Which are the top apps for you civil engineering?

1143


why development length = 50D . why not 100D

2048


How to testing voids of filled aggregate in bitumen mix design

1917


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

2135


what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)

1991


how to calculate MR 9(derivation)

2941


Why the statue of liberty is made of copper?

1097


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2153


How we calculate the service time of buildings

1872


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2262