• What types of scrap can be maintained in PP basic data and
how would they be considered during MRP repectively scheduling?

Answer Posted / mohamed ibrahim

types of scrap
1- assembly scrap
increasing the assembly % in prod.order consequently increasing its components
maintain it in MRP1
2-component scrap
one component loss of QTY during production that's require increasing its QTY.you maintain this in item details in BOM and in MRP4 view
3-operation scrap
during an operation, there was a loss of QTY that require the operation scrap. you maintain it in BOM item details with check NET ID that indicates the QTY loss and also in a routine that indicates the activity loss

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Mention what are the keyfields found in mrp view 1?

744


Control keys

1518


Mention what is the t-code for changing production order and to display production order?

720


What is sla (service level agreements)?

724


What is requirement class and requirement type?

1284






Define 'sop' (sales & operations planning)?

811


What is SOP and types of SOP?

1354


Difference between Item categories or what is variable size item or non stock item.

2242


Explain service level agreements

695


What is Schedule Margin key. How floats works in scheduling?

2641


Explain why their is need of production version ?

695


what is alternative item group

2078


What is alternative BOM, or diff between BOM group and Group BOM?

1279


What is the use of infogroups?

708


What are sequence, parallel, overlapping, splitting and where can we assign these

1629