• What types of scrap can be maintained in PP basic data and
how would they be considered during MRP repectively scheduling?
Answer Posted / mohamed ibrahim
types of scrap
1- assembly scrap
increasing the assembly % in prod.order consequently increasing its components
maintain it in MRP1
2-component scrap
one component loss of QTY during production that's require increasing its QTY.you maintain this in item details in BOM and in MRP4 view
3-operation scrap
during an operation, there was a loss of QTY that require the operation scrap. you maintain it in BOM item details with check NET ID that indicates the QTY loss and also in a routine that indicates the activity loss
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Mention what are the keyfields found in mrp view 1?
Control keys
Mention what is the t-code for changing production order and to display production order?
What is sla (service level agreements)?
What is requirement class and requirement type?
Define 'sop' (sales & operations planning)?
What is SOP and types of SOP?
Difference between Item categories or what is variable size item or non stock item.
Explain service level agreements
What is Schedule Margin key. How floats works in scheduling?
Explain why their is need of production version ?
what is alternative item group
What is alternative BOM, or diff between BOM group and Group BOM?
What is the use of infogroups?
What are sequence, parallel, overlapping, splitting and where can we assign these