• What types of scrap can be maintained in PP basic data and
how would they be considered during MRP repectively scheduling?
Answer Posted / mohamed ibrahim
types of scrap
1- assembly scrap
increasing the assembly % in prod.order consequently increasing its components
maintain it in MRP1
2-component scrap
one component loss of QTY during production that's require increasing its QTY.you maintain this in item details in BOM and in MRP4 view
3-operation scrap
during an operation, there was a loss of QTY that require the operation scrap. you maintain it in BOM item details with check NET ID that indicates the QTY loss and also in a routine that indicates the activity loss
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain the mrp group and their uses.
Explain how the pp module is organized in sap?
What is alternative BOM, or diff between BOM group and Group BOM?
Explain why there is need of production version?
What are the key fields in MRP views?
In project the customization is comes under which phase?
What is collective order. Pre requisite of the collective order?
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
What is 'capacity planning'?
What is the standard info set?
Integration between PP and PM module.
What is sap pp?
Integration between PP and MM Module.
What is a ‘work center’ in pp?
What is Phantom Assembly?