What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / farhat abbas naqvi
For deshuttering any concrete structure after pour to take in note the climate and design mix. For columns and beams sizes plays the major role. Usage of flyash also plays role in settling time.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
How to find CN by using arcgis 9.3?
Explain what is 1/8 on the architect ruler denotes?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
what is project?
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
How to fix toll charge for a particular vehicle at toll booths in a highway?
What is limit state method and working stress method and ultimate method
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
how to calculate the density for high density concrete ? or is it same as the density of RC?
How do You Maintain a structure after getting cube test of low strength.
how to calculate reinforcment in staircase cranked beam?
How to determine thee cut length for steel reinforcement bars in R.C.C design
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
What is the average density of soil?
What glue is least sticky?