What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / farhat abbas naqvi
For deshuttering any concrete structure after pour to take in note the climate and design mix. For columns and beams sizes plays the major role. Usage of flyash also plays role in settling time.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
what is the water-cement ratio of mix design while 30mpa in 7 days?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
What difference comes in constructing of house and a housing complex like society
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
What is the difference between linear dimension and aligned dimension?
How to find permissible diagonal tensile stress in reinforced brick work
what are the values of compressieve strenght?
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
In a concrete grade C35A, C & A stands for what and equalent cube strength?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
how to calculate the chair reinforcement length in slabs, footing or anywhere??
What are the advantages of building a dam on the river nile?