Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what,s the clear cover of beam,slab,column,lintel and
foundation?

Answer Posted / asraf ahamex

Slab 15mm,beam25mm,column 40mm ,footing 50mm

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:

3558


Formula for calculation volume of essentric footing

1866


How much time Required for PPR pipe network testing

2186


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

2028


Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.

2272


What is the exception critarea of cube?

2577


What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

2774


What is thumb rule in quantity and cost estimation of a residential building?

3180


a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula

1730


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2210


how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm

2174


If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?

1770


What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.

2504


who to find building iron rod strenth

2235


How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

2123