what,s the clear cover of beam,slab,column,lintel and
foundation?
Answer Posted / ranjan kishore
for slab it is=20mm but can be reduced to 15 mm for mild exposure and bar dia less than 12mm.
beam=25mm
column=40mm
footing=50mm
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
What is absolute coordinates?
Explain the different types of roofing systems?
Explain the importance of moment of inertia?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Please let me know what is the simplest way of Calculating Mix Designs
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
How much is the cover for slab?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
it is possiblee to produce concrete with out cracks...
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
plumbing CPVC fitting FTE Brass full form
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
how to find out hard strata in bored pile when the DMC method adopted.
How much time Required for PPR pipe network testing