Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why reheater is not used after IP turbine.

Answer Posted / ajay ahake (npti ngpr )

Because , exhaust of IP is low pressure and high tempreture , when we reheat only tempreture increase but not pressure , that heat energy is not produce work unless it has pressure energy .... also that huge quantity steam can only use for number of LPTs .

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

LAPT working in alternator / generator

3691


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3466


What is difference between secondary Air & Tertiary Air and Their use.?

2059


what is the basic use of power plant in equipment

1837


what is natural frequency of turbine shaft .

2362


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

1044


what is the trip circuit supervision in an electrical meaning?

2225


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2561


What is LB-SR.

3067


what is restricted earth fault explain in details

2101


operation

1964


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3309


what's the moog valve

1549


How do you consider that you can improve and what assistance do you need to achieve this

1796


what is the meaning of SST300 V56A in SIEMENS turbine

4410