Answer Posted / kamal chhetri, material engine
GSB= it is the foundation layer of the road pavement, comprising the materials of required sizes as specified in the gradation table, having LL <25,PI <6 and and CBR>30% in order to meet the strength, filter and drainage requirement of the granular sub base and compaction more than 95%
WMM= It is the structural component of the road pavement, comprising the clean and crushed material of sizes as per the gradation required, having PI<6 and strength of the aggregates should not be less than 30% by LAA or AIV and compaction >98%.
Is This Answer Correct ? | 31 Yes | 2 No |
Post New Answer View All Answers
Define a polyline?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
What is meant by cad?
Coverage of 25mm.thick ratio of 1:4 cement mortar?
what is the name of shuttering oil used in oman
How many cement sand ballast in cc 1:4:8 40mm
What are advancements in civil engineering?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
Explain soil analysis?
What will you do if you encounter problems like accidents?
what is called the inverd level of mabhole chamber?
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
Define the various stages of the project planning process in construction.
What is the difference between Hinged and pinned in Column ends
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks