How to calculate productivity of construction equipment
like excavator, dozer, rock breaker, riper

Answer Posted / vinod k

I think 75% efficiency is correct as excavation of soil itself takes time & depends upon the area where excavation is to be done, if the excavation area is mix of soil & rocks then efficiency will be less & No. of cycles/hr will also come down.
This calculation is for ideal condition.

Is This Answer Correct ?    1 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Critical path in Ms-Project ?

798


Material calculation of cm 1:6 for 1sqm

1616


why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?

2854


I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

1770


Why Vitrified tile are getting pop up.

651






What is Architect-Prepared Contract?

832


What is the difference between a wood shake and wood shingles?

804


what are the types of design? which type of method is used at what type of design & why?

1877


What are new methods /technologies of pothole patching?

1990


What is OSHA compliance?

784


How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.

1889


HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL

1067


1m square 20mm plastering how much of water need curing work

1560


Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)

1568


Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1419