dear all, How do i increase UPS (1000VA)backup time ? i
have connected 2 12v wold you please 120 aH battery
externally. ups charge the lead acid battery only 12.7 volt.
backup time only 10.00 minuts and gose off. can any one of
you help me?
Answer Posted / waqasfarooqui22@gmail.com
1 kva ups is not. charging current 120AH battery therefor use to external charger use or calibratIoin. of ups or overload
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Anyone who can recommend an equivalent to Envirotemp FR3 of Cooper?
How many double suspension hardware fittings are required on a double circuit transmission tower?
Explain the construction of the conservator, operation and purpose, and draw the diagram of the conservator.
Is it possible to protect 3phase overload and earth fault of the 3phase system using two CT's.
What are the difference between CT/PT operated Meter and RRAMR Meter for HT/LT application?
draw the restricted earth fault protection circuit install on power transformer and identify its parameters and draw C/C curve of it
i had aplied Hindustan Petroleum corporation limited for the post of maintenance technician -Electrical,i want model questions,if anybody have please send it or please advice?
What are the essential characteristics of signal flow graphs?
i need mat lab program to find out the transmission line losses,regulation and losses
Why power genaration in India is at 50HZ while America its 60HZ
What are the special cables required for explosion proof wiring?
Can u tell me design of switch yard
how to find out cable size if load is 2800 watts, 230 volts AC supply and load distance is 1800 meters
The knee point of a current transformer is normally unique and known.So why in the nameplate of a CT they put the minimum value like this Vk> 400v.
How to decide CT & PT ratings for a given transmission line carrying some rated voltage?