If a load test has to run for 4 hours with 2,000 users, and
the average iteration completes in 10 minutes, how many
transactions will run per minute? can any give the calculation
please.
Answer Posted / sharmila rahman
Time taken for one iteration to complete = 10 min
No of iteration completed in one min(1 User) = 1/10 = 0.1
No of Iteration completed by 2000 users in one min = 0.1*2000 = 200
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
Which components have you used in loadrunner ?
How do you decide the number of load generator machine required to run a test?
When the rendezvous point is insert?
What is report header and what are the information contains?
How to create a scenario?
What are different types of vuser logs which can be used while scripting and execution? What is the difference between these logs? When you disable logging?
What is report viewer?
What is the difference between transaction and transaction instance in loadrunner ?
How to run a scenario?
What is the configuration of systems when using load runner?
In a web server, database and network are all working fine and now, where could be the problem?
What are the types of checkpoints is available in loadrunner?
What would be your recommendation to improve performance measure?
What are the element in the loadrunner controller?
How you load a loadrunner agent?