Answer Posted / a manoj kumar
bus bar is the one which carries larger currents of 3000A< in a power plant
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
Battery is a voltage source? give one example of current source and why?
How a capacitor discharge weld power supply works? what is the use of a pulse transformer?
15hp motor wound by 0.9mm & 0.95mm magnet wire. at no load test it draw 4.2A current. Another motor with same condition draw 9.2A current. How can that occur? pls help
placing earthing pit in pathway is correct or wrong??. placing earthing wireGI1/18 inside walls is correct or wrong?. explain!!!
how to test power transformer.YNd11
How can we findout the maximum efficiancy of Transformer? At which load?
What are Contactors? How they works and what its highest rating?
what happens when dc generator coupled with cycle shaft.also explain what happens when its loaded
why ahould you show client/engineer activities clearly on the project plan
if we install two earth pits with a clear space of 5m without any interconnection,by checking the digital multimeter will it show continuity between earth pits? If so what would be the approx. value
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
As we know diode work on both negative and positive but converting ac into DC we have to given a/c from negative of diode or positive side.please give me answer.
Explain about Dubai electrical sysaem? Explain about Dubai drinking water system? Explain about Dubai Burj tallest building Electrical,Water.etc.. maintenance system?
i have done diploma and btech in EE and live in Chandigarh so kindly help me how can i make my competency certificate in my area.