how the find the quantity of water used to make 1 cubic meter concrete mortor
Answer Posted / senthil473
first we should know the ratio of the cement mortar, then find the quantity of cement. you should select a w/c ratio. using the water cement ratio and cement content (in kg) per cubic meter of mortar you can find the water content. NOTE: 1 kg of water is 1 liter of water.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
What is the withdrawal force of steel nails?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
What is progress payment?
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
For what building Built-on balconies are preferable? What are the advantages?
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
How to arrive d*d/162 , for finding the kg per meter , wt of steel
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
What is construction mitigation management?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
Which is the best book for building construction?