Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why high pressure heater will take after sufficient pressure?
what happen when high pressure heater will take from COLD
REHEAT line at light up time when hp and lp by pass in
service.(means can we heater take at low pressure?)

Answer Posted / chetan h malaviya

We can take CRH extraction line(HPH 6) in line during lit up but at that time pressure of CRH line must be >5 kg/cm2 and corresponding degree of super heating must be >100 'C

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what's the moog valve

1520


explain how the third harmonic content of the magnetising current affects transformer design

3299


can dp type level transmitter work in under vaccum condition

1997


what is the meaning of SST300 V56A in SIEMENS turbine

4371


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2500


Why superheated are started before I'd and rd fan?

2198


How We Calibrate the vaccum transmitter?

1981


what is the trip circuit supervision in an electrical meaning?

2141


What is difference between secondary Air & Tertiary Air and Their use.?

2012


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

2302


How do you consider that you can improve and what assistance do you need to achieve this

1771


why do you consider yourself a suitable candidate for this position

7464


We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1930


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3420


what does mean by kva rating

1529