What is Entry and Exit criteria for a Test Plan?
Answer Posted / syamala chowdary
Entry Criteria:
1.All test cases are signoff
2.Saftware & Hardware are ready
3.Resourse are available
4.Test plan & Review are signoff
Exist criteria:
1.When all the defects are complete
2.All test cases are executed
3.100% Test coverage done
4.There is no High seviority defect open in the system
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Metrics of your Project?
What is differences between SCS-1,2 and 3
how to download fullversion of JIRA(defect reporting s/w) s/w for free.can any provide web site for full version free download.
In which phase should testing begin – requirements, planning, design, or coding?
In the 7 Stages of the SDLC (Planning, System Analysis, System Design, Development, Testing, Implementation, and Maintenance), what is the INPUT and OUTPUT of each stage?
What is a user manual?
What is the most critical component in SAN?
what is the most challenging situvation r u phased while during testing?
What is end-to-end testing?
Why is incremental integration preferred over 'big bang' integration?
Explain the requirements?
Please some one answer these Q's 1.Modules in Pension Domains ? 2.What Should we Test on Pension Domain.? Thanks in Advance Stewie
What is metric?
What is criticality?
Best institute for protocol testing in Hyderabad ? How will be the market for protocol testing ?