What is Entry and Exit criteria for a Test Plan?
Answer Posted / syamala chowdary
Entry Criteria:
1.All test cases are signoff
2.Saftware & Hardware are ready
3.Resourse are available
4.Test plan & Review are signoff
Exist criteria:
1.When all the defects are complete
2.All test cases are executed
3.100% Test coverage done
4.There is no High seviority defect open in the system
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is dynamic analysis?
Explain what test deliverables is?
What is a user manual?
What is the purpose of a test completion criterion?
In which phase should testing begin – requirements, planning, design, or coding?
Explain mutation testing?
Functional testing?
give an example of unit test and integration test and system test and UAT test?
Explain glass box testing?
IF i have two columns in Database , While using Database output value ,allthe values in the two column are set as a single row in the QTP datatable, can u suggest me a idea so that QTP Runtime datatable displays the values as it is in the database
Explain defect?
What is functional specification?
What is the benefit of test independence?
I am asked to create Usability testing methodology document, basically listing the Procedures & methodology to/for: a. Entry criteria Exit criteria for usability test b. Deliverables d. Methods of doing Reviews and inspection e. Methods of Reporting f. at which testing phase usability testing is done in v model Is there any sample document/template available on Internet? Any help will be greatly appreciated.
How will you define a critical bug?