Method of findingthe dry ingredient quantity of 1 m3
concrete.
Answer Posted / mufaddal hamdard
1.5m3 of dry material is required to get 1m3 of concrete.
and 2% or 5% is the amount of waste taken in account
1.5 + 0.02 is 1.52
or
1.5 + 0.05 is 1.55 thats it.
and now how 1.5 is derived is the question
As it is considered that when materials are mix in mixer the voids are finished after mixing and the output is 67% of the input in mixer
so
1/.67 is 1.5
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is soil enforcement?
Is there any course for billing available in Mumbai? If yes then please mail me the details..
how many digree of freedom in four bar chain
what is meant by csr in foundation? what is sbc?what is meant by contour line?
How are freeway bridges built?
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
How to do bbs in excel format
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
Why concrete barriers have curved surface profiles?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
how to caluclate sienerge qty in construction in ap
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
Would you cause a 55-gallon drum of water to weigh more by climbing in?
Define What are the materials used in building a gravity dam?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day