how much water you will add to the mix, for making 1 m3 of
concrete to achieve strength of mix 20N/mm2 at 28 days.
Answer Posted / rohit ghorpade (r g)
25-30 Lit. Water required for 1 bag cement concrete.
| Is This Answer Correct ? | 17 Yes | 4 No |
Post New Answer View All Answers
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
How many cement sand ballast in cc 1:4:8 40mm
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
Difference between pre-tensioning and post-tensioning.
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
For what building Built-on balconies are preferable? What are the advantages?
how to calculate the chair reinforcement length in slabs, footing or anywhere??
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
What is zoning permit?
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need