Answer Posted / brij bhushan sharma
Material Planning of two types
1. MRP- Material Requirement planning- This planning based on quantity calculated based on BOM and requirement.
2. Consumption Based Planning- Its based on three parameter
A) Periodic Planning
B) Forecast Planning
C) Re-order planning
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Why is work scheduling required for semi finished and finished products?
What is Material status and which view of the material master it is available?
What is the use of QM control key?
What is alternative BOM, or diff between BOM group and Group BOM?
What is prt (production resource tools) in sap pp?
what are the problems you faced in MRP?
Can’t one material be assigned to more than one operation in a routine?
Different types of consumption based planning.
Explain Planning file entry.
What is the purpose of using capacity planning?
Question related to Production order status or status profile?
How can I use variable size items?
What are all the ‘technical types of bom’?
How do you get the system to update this value from the routing?
What is qualification deficiency? How will you come to know that a person does not have certain skills/qualification?